Library

Video Player is loading.
 
Current Time 0:00
Duration 8:51
Loaded: 0.00%
 

x1.00


Back

Games & Quizzes

Training Mode - Typing
Fill the gaps to the Lyric - Best method
Training Mode - Picking
Pick the correct word to fill in the gap
Fill In The Blank
Find the missing words in a sentence Requires 5 vocabulary annotations
Vocabulary Match
Match the words to the definitions Requires 10 vocabulary annotations

You may need to watch a part of the video to unlock quizzes

Don't forget to Sign In to save your points

Challenge Accomplished

PERFECT HITS +NaN
HITS +NaN
LONGEST STREAK +NaN
TOTAL +
- //

We couldn't find definitions for the word you were looking for.
Or maybe the current language is not supported

  • 00:00

    hi guys and welcome back to SITENG in today's  video i'm going to show you the capping beam  
    hi guys and welcome back to SITENG in today's  video i'm going to show you the capping beam  

  • 00:05

    and you're going to find out how to  construct the capping step by step  
    and you're going to find out how to  construct the capping step by step  

  • 00:09

    as you can see works carries on it's very busy  now all capping beam is finished but i'm going  
    as you can see works carries on it's very busy  now all capping beam is finished but i'm going  

  • 00:14

    gonna show you as I said step by step all the  works to captain beam construction so let's go  
    gonna show you as I said step by step all the  works to captain beam construction so let's go  

  • 00:34

    guys so this is first step when doing the  cupping beam after the pilings finished we  
    guys so this is first step when doing the  cupping beam after the pilings finished we  

  • 00:41

    actually after seven days you can start uh  uncovering the pies but this this we're waiting  
    actually after seven days you can start uh  uncovering the pies but this this we're waiting  

  • 00:47

    here much longer anyway so you see i got the laser  here it's actually part of the beam already done  
    here much longer anyway so you see i got the laser  here it's actually part of the beam already done  

  • 00:53

    but uh it doesn't really matter you're gonna be  doing the same steps so first we're getting to  
    but uh it doesn't really matter you're gonna be  doing the same steps so first we're getting to  

  • 00:59

    the to the dig level which is uh i set this this  case 75 mil below the blinding level and yeah  
    the to the dig level which is uh i set this this  case 75 mil below the blinding level and yeah  

  • 01:06

    we're going to be cropping the pulse i'm going  to show you this later and uh of course after  
    we're going to be cropping the pulse i'm going  to show you this later and uh of course after  

  • 01:11

    this we have to test the piloting credit integrity  testing and uh i'm going to show you step by step  
    this we have to test the piloting credit integrity  testing and uh i'm going to show you step by step  

  • 01:16

    anyway yeah so but this is step number one i would  say but before this i'm going to show you what I  
    anyway yeah so but this is step number one i would  say but before this i'm going to show you what I  

  • 01:21

    what i do and this is a very good practice if you  do this as well on site uh just give me a second  
    what i do and this is a very good practice if you  do this as well on site uh just give me a second  

  • 01:29

    so you can see there on that hoarding i mark the  grid lines a d a c a b as they go and i actually  
    so you can see there on that hoarding i mark the  grid lines a d a c a b as they go and i actually  

  • 01:38

    might on the holding in the stab institute if  i step in the soffit of the beam i'll make a  
    might on the holding in the stab institute if  i step in the soffit of the beam i'll make a  

  • 01:42

    small table there as well and uh i make on the  horning i put the nails there as well for the  
    small table there as well and uh i make on the  horning i put the nails there as well for the  

  • 01:49

    for the dig level two meters and on that table i  got everything so whoever comes he could actually  
    for the dig level two meters and on that table i  got everything so whoever comes he could actually  

  • 01:53

    use it but it is good for yourself as well  and the grid line is very important you just  
    use it but it is good for yourself as well  and the grid line is very important you just  

  • 01:58

    you know where you are where you're pouring  where you're digging even from from from far  
    you know where you are where you're pouring  where you're digging even from from from far  

  • 02:03

    so yeah that would i would start from this  let's say that would be like coordination of  
    so yeah that would i would start from this  let's say that would be like coordination of  

  • 02:08

    your side really as well that's very useful  that's going to be very useful for you  
    your side really as well that's very useful  that's going to be very useful for you  

  • 02:12

    and yeah that's it yeah let's go to the next step  just to quickly show you i just uh set a level  
    and yeah that's it yeah let's go to the next step  just to quickly show you i just uh set a level  

  • 02:18

    for the uh the cut off level actually that guy's  going to be cropping first using this machine here
    for the uh the cut off level actually that guy's  going to be cropping first using this machine here

  • 02:30

    and it goes to the dumper goes away on the lorry  and that's how it works yeah so all them piles are  
    and it goes to the dumper goes away on the lorry  and that's how it works yeah so all them piles are  

  • 02:35

    going to be cropped first and then they're  going to be cut with a with a blade to the  
    going to be cropped first and then they're  going to be cut with a with a blade to the  

  • 02:40

    proper level and then broken and down in the  middle as you cannot go too deep with a blade  
    proper level and then broken and down in the  middle as you cannot go too deep with a blade  

  • 02:45

    but you could uh actually cut the  steel so yeah that's how it works  
    but you could uh actually cut the  steel so yeah that's how it works  

  • 02:49

    next stage uh probably gonna be pile testing  and blinding and i'll show you everything
    next stage uh probably gonna be pile testing  and blinding and i'll show you everything

  • 02:53

    okay i show this
    okay i show this

  • 03:07

    so the next step guys uh it's the  blinding you can see the laser on the  
    so the next step guys uh it's the  blinding you can see the laser on the  

  • 03:11

    back and you can see the grid lines  as well as as i showed you before  
    back and you can see the grid lines  as well as as i showed you before  

  • 03:14

    so the laser is set and the blinding gonna be our  legs level this is maybe not the best uh picture  
    so the laser is set and the blinding gonna be our  legs level this is maybe not the best uh picture  

  • 03:20

    showing the blinding as the finish uh will be  better before you start uh marking the lines  
    showing the blinding as the finish uh will be  better before you start uh marking the lines  

  • 03:26

    but that's it so that's the blinding and  then we're gonna do the lines so on this  
    but that's it so that's the blinding and  then we're gonna do the lines so on this  

  • 03:30

    picture you can actually see the one of the  healthy nails i'm using the concrete nails  
    picture you can actually see the one of the  healthy nails i'm using the concrete nails  

  • 03:35

    when marking the lines as uh using the spray you  can you can lose your line when it's raining but  
    when marking the lines as uh using the spray you  can you can lose your line when it's raining but  

  • 03:40

    the nail is gonna stay always so you can  you can redo your line you can do it again  
    the nail is gonna stay always so you can  you can redo your line you can do it again  

  • 03:45

    and the guys can use it they know where the line  is so you can see the line is marked there and as  
    and the guys can use it they know where the line  is so you can see the line is marked there and as  

  • 03:51

    fixers using it to fix their steel to the line  and that's going to be line for the chip is for  
    fixers using it to fix their steel to the line  and that's going to be line for the chip is for  

  • 03:55

    the shutter you see on this picture there's  a shutter set to the line and yeah that'll  
    the shutter you see on this picture there's  a shutter set to the line and yeah that'll  

  • 04:00

    be all for the for the marking the lines on the  blinding so the next step in cupping beam i was  
    be all for the for the marking the lines on the  blinding so the next step in cupping beam i was  

  • 04:06

    just marking the level you see the starter bars  there for the slop so i was marking the soffit i  
    just marking the level you see the starter bars  there for the slop so i was marking the soffit i  

  • 04:12

    don't know if you can see here using the tip-ex  the white mark that's the soffit of the slab  
    don't know if you can see here using the tip-ex  the white mark that's the soffit of the slab  

  • 04:19

    and then yeah the next thing i'm just going to  do the pre-inspection i'm going to go with you  
    and then yeah the next thing i'm just going to  do the pre-inspection i'm going to go with you  

  • 04:23

    around the beam and i'll show you but all the rest  we're going to i'm going to show you uh in the  
    around the beam and i'll show you but all the rest  we're going to i'm going to show you uh in the  

  • 04:28

    construction drawing series uh the draw the video  corresponding this one so you can see the still  
    construction drawing series uh the draw the video  corresponding this one so you can see the still  

  • 04:34

    here the columns here i marked the center of the  columns that's what let's uh want it these guys  
    here the columns here i marked the center of the  columns that's what let's uh want it these guys  

  • 04:40

    you can see that's a lightning protection cable  that's the connection here let me show you now  
    you can see that's a lightning protection cable  that's the connection here let me show you now  

  • 04:49

    two clamps connecting the cable and i actually do  it myself i want to make sure this is done right  
    two clamps connecting the cable and i actually do  it myself i want to make sure this is done right  

  • 04:55

    obviously if i got time for it but  i'll try to do these things myself  
    obviously if i got time for it but  i'll try to do these things myself  

  • 05:00

    and then yeah that's another one i just
    and then yeah that's another one i just

  • 05:05

    tied it into the rebar so you're gonna see the  detail on the construction drawing video covering  
    tied it into the rebar so you're gonna see the  detail on the construction drawing video covering  

  • 05:11

    the captain beam and yeah so that's another thing  you need to remember when doing the capping beam
    the captain beam and yeah so that's another thing  you need to remember when doing the capping beam

  • 05:49

    so this is guys after inspection client  is happy with the steel i'm happy too  
    so this is guys after inspection client  is happy with the steel i'm happy too  

  • 05:55

    we pour in the concrete we got concrete which  is already slammed now and it's quite alright  
    we pour in the concrete we got concrete which  is already slammed now and it's quite alright  

  • 06:07

    okay fixtures are working here that's my line  
    okay fixtures are working here that's my line  

  • 06:10

    i marked the back line to be safe in front  really but i'm checking the front as well
    i marked the back line to be safe in front  really but i'm checking the front as well

  • 06:29

    in and out in and out
    in and out in and out

  • 06:42

    okay next bucket oh be coming of my starter bars  that's what sometimes happen as well you just  
    okay next bucket oh be coming of my starter bars  that's what sometimes happen as well you just  

  • 06:52

    someone can move the column  and that's the problem later
    someone can move the column  and that's the problem later

  • 06:59

    oh we got a good driver here and he's watching  
    oh we got a good driver here and he's watching  

  • 07:29

    you see guys are putting now in the  beam uh just the shoes for the barriers
    you see guys are putting now in the  beam uh just the shoes for the barriers

  • 07:37

    this one is empty now the driver is cleaning  his i'll show you now yeah he's shoot
    this one is empty now the driver is cleaning  his i'll show you now yeah he's shoot

  • 07:48

    this water is not going into the beam you have  to get rid of it and then we're waiting for the  
    this water is not going into the beam you have  to get rid of it and then we're waiting for the  

  • 07:53

    next lorry and carry on so on and on so that's  how the that's how the works with captain beam  
    next lorry and carry on so on and on so that's  how the that's how the works with captain beam  

  • 07:59

    looking really so just as a summary you see  the beam is full we got a nice finish here  
    looking really so just as a summary you see  the beam is full we got a nice finish here  

  • 08:04

    uh we got something like this that gonna be  watched later just to uncover maybe the aggregate  
    uh we got something like this that gonna be  watched later just to uncover maybe the aggregate  

  • 08:10

    just when connecting with the slab later but  that's going to be other contractor you see the  
    just when connecting with the slab later but  that's going to be other contractor you see the  

  • 08:14

    castings here that's going to be taken out bank  and we're going to put the barriers like that  
    castings here that's going to be taken out bank  and we're going to put the barriers like that  

  • 08:21

    inside i just quickly show you this so the  barriers here can be saved and after seven days  
    inside i just quickly show you this so the  barriers here can be saved and after seven days  

  • 08:28

    i'm going to show you the results for the cubes  and we can start digging here for the basement  
    i'm going to show you the results for the cubes  and we can start digging here for the basement  

  • 08:37

    so that would be all for the cupping  beam meme see you on the next video
    so that would be all for the cupping  beam meme see you on the next video

All noun
beam
/bēm/

word

long supporting structure

CAPPING BEAM construction process

12,734 views

Intro:

hi guys and welcome back to SITENG in today's  video i'm going to show you the capping beam  
and you're going to find out how to  construct the capping step by step  
as you can see works carries on it's very busy  now all capping beam is finished but i'm going  
gonna show you as I said step by step all the  works to captain beam construction so let's go  
guys so this is first step when doing the  cupping beam after the pilings finished we  
actually after seven days you can start uh  uncovering the pies but this this we're waiting  
here much longer anyway so you see i got the laser  here it's actually part of the beam already done  
but uh it doesn't really matter you're gonna be  doing the same steps so first we're getting to  
the to the dig level which is uh i set this this  case 75 mil below the blinding level and yeah  
we're going to be cropping the pulse i'm going  to show you this later and uh of course after  
this we have to test the piloting credit integrity  testing and uh i'm going to show you step by step  
anyway yeah so but this is step number one i would  say but before this i'm going to show you what I  
what i do and this is a very good practice if you  do this as well on site uh just give me a second  
so you can see there on that hoarding i mark the  grid lines a d a c a b as they go and i actually  
might on the holding in the stab institute if  i step in the soffit of the beam i'll make a  
small table there as well and uh i make on the  horning i put the nails there as well for the  
for the dig level two meters and on that table i  got everything so whoever comes he could actually  
use it but it is good for yourself as well  and the grid line is very important you just  
you know where you are where you're pouring  where you're digging even from from from far  
so yeah that would i would start from this  let's say that would be like coordination of  

Video Vocabulary

/ˈhōldiNG/

noun verb

area of land held by lease. To have a specific quality or property.

welcome - welcome

/ˈwelkəm/

adjective exclamation noun verb

Being what was wanted or needed. used to greet someone in polite or friendly way. instance or manner of greeting someone. To greet someone who has just arrived.

/ˈpīliNG/

noun other

heavy stakes or posts installed to support foundations of superstructure. Long posts used to support some things.

/ˈkerē/

noun verb

act. To support the weight or burden of something.

/kräp/

verb

To cut something to a shorter length or size.

/kap/

verb

cover.

/ˈinstəˌt(y)o͞ot/

noun verb

Organization studying science, engineering etc.. To start or commence doing, e.g. a business plan.

/ˈak(t)SH(o͞o)əlē/

adverb

Used to add new (often different) information.

/ɡet/

verb

To obtain, receive or be given something.

/kənˈstrəkSH(ə)n/

noun

Act of building something; thing that is built.

/ˈpīlət/

verb

To fly a plane; to direct a ship.

noun verb

idea or theory. build or make.

/ˈblīndiNG/

adjective noun verb

very bright. covering of road with grit. To be unable to see the truth about a situation.

/diɡ/

verb

break up and move earth.